PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Metal decking at Derrick -2 Facing South-West (800x600).jpg Welding Derrick -2 Facing North-East (800x600).jpg Core Drilling for Conduit Facing West (800x600).jpg Damaged foundation wall at column line K-2.5 Facing West (800x600).jpg Excavation for foundation walls along column line 6.5 from G-C.7 Facing South (800x600).jpg Instaling metal decking at Derrick -2 Facing North-West (800x600).jpg Installing metal decking at Derrick -2 Facing West (800x600).jpg Installing steel angles for metal decking at Elev. 1,2,3  (2nd Floor) Facing North (800x600).jpg Installing steel angles for metal decking at Elev. 1,2,3  (2nd Floor) Facing West (800x600).jpg
Previous pageNext page Excavation for foundation walls along column line 6.5 from G-C.7 Facing South (800x600)
Excavation for foundation walls along column line 6.5 from G-C.7 Facing South (800x600)